Skip to content
Discuss your project

04 / 05

Laboratories & ISO/IEC 17025

Method Validation & Measurement Uncertainty

Validated methods and evaluated measurement uncertainty, for results whose validity is demonstrated and monitored.

We support method validation and comparison — the study of trueness, precision and bias, and the comparison of means and variances with Student’s t-⁠test and Fisher’s F-⁠test — the evaluation of measurement uncertainty using the GUM approach, the Monte Carlo method or validation and quality control data, and the introduction of control charts to monitor the validity of results. For water analysis, we also draw on the references specific to that field: NF T90-⁠210, FD T90-⁠230 and ISO 11352.

GUM, ISO 11352, ISO 5725, NF T90-⁠210, FD T90-⁠230

Typical situations

Needs range from validating a method to monitoring its results over time.

  • A new method to validate

    The laboratory is introducing a method and needs to demonstrate that it is fit for its intended use.

  • Uncertainty to evaluate

    Measurement uncertainty needs to be estimated and documented for the tests concerned.

  • Results to monitor

    The laboratory needs to monitor the validity of its results over time and respond to drift.

How we help

Three linked parts: validate, quantify, monitor.

Method validation

Method validation and comparison, with the study of trueness, precision and bias with reference to ISO 5725, and the comparison of means and variances with Student’s t-⁠test and Fisher’s F-⁠test. For water analysis, NF T90-⁠210 frames the initial performance assessment and FD T90-⁠230 guides the choice of representative matrices.

  • Method validation
  • Method comparison
  • Trueness, precision and bias
  • Comparison of means and variances (Student’s t-⁠test, Fisher’s F-⁠test)

Measurement uncertainty

Evaluation of measurement uncertainty using the GUM approach, Monte Carlo simulation or the laboratory’s validation and quality control data, an approach that ISO 11352 describes for water analysis.

  • GUM approach
  • Monte Carlo method
  • Validation and quality control data
  • ISO 11352 for water analysis

Validity of results

Control charts and a system for monitoring the validity of results, to detect drift and document decisions.

  • Control charts
  • Monitoring the validity of results

Our expertise in detail

Method validation

Validation demonstrates that a method is fit for its intended use. We help define the validation plan, carry out the statistical evaluation and write the validation report.

Method comparison makes it possible to assess whether an in-house method gives results comparable to those of a reference method. Student’s t-⁠test and Fisher’s F-⁠test are then used to compare the means and variances of the result series.

Measurement uncertainty

Uncertainty can be evaluated with the GUM approach, which combines the uncertainty components identified in the measurement model, or with Monte Carlo simulation, which propagates distributions when the model does not lend itself to this analytical approach, for example when it is strongly non-linear.

It can also be based on the laboratory’s validation and quality control data: within-laboratory reproducibility and bias. For water analysis, ISO 11352 describes this approach.

We choose the approach suited to the test with you and document the calculation.

Control charts and validity of results

Control charts make the drift of a method visible over time. Together with other monitoring tools, they help demonstrate the validity of results.

Frameworks & standards

  • ISO/IEC 17025Competence of testing and calibration laboratories
  • ISO 5725Accuracy (trueness and precision) of measurement methods and results
  • GUMGuide to the expression of uncertainty in measurement (ISO/IEC Guide 98-⁠3)
  • ISO 11352Water quality — estimation of measurement uncertainty based on validation and quality control data
  • NF T90-⁠210French standard — water quality: protocol for the initial method performance assessment in a laboratory
  • FD T90-⁠230French guidance document — water quality: characterization of analytical methods, guide for the selection of a matrix representative of a scope of application

Typical project flow

From the validation plan to monitoring.

  1. Plan

    Define the characteristics to study, the tests and the criteria.

  2. Evaluate

    Analyze the validation and control data statistically.

  3. Document

    Write the validation report and the uncertainty calculation.

  4. Monitor

    Set up control charts and the monitoring of results.

A method to validate or uncertainty to evaluate?

Tell us about your laboratory, its scope of testing and your timeline. We will let you know how we can help.